Southern Company’s 100 MW Nacogdoches Generating Facility – which the company calls the nation’s largest biomass plant – is now operational and putting electricity on the grid in Texas.
Meer lezen
Brewery combines wind, solar and biogas
Between biogas, wind and solar, Anheuser-Busch generates about half of its electricity from renewable energy to make beer at its Fairfield, California plant.
The company is the largest in the US to use nutrients in its wastewater to make biogas, a process called bio-energy recovery systems (BERS).
Meer lezen
Pellet fired boiler
In pellet fired boilers, the pellets are stored in a grain-type storage silo, and gravity is used to move them to the boiler.
Meer lezen
Biomass pellet production
Pellets are a processed form of biomass, which make them more expensive. Although they are more expensive, they are much more condensed and uniform, and therefore are more efficient.
Meer lezen
Algae
To be competitive and independent from fluctuating support from (local) policy on the long run, biofuels should equal or beat the cost level of fossil fuels. Here, algae based fuels hold great promise, directly related to the potential to produce more biomass/ha-year than any other form of biomass.
Meer lezen
Ethanol production
The principle fuel used as a petrol substitute for road transport vehicles is bioethanol. Bioethanol fuel is mainly produced by the sugar fermentation process. Our experts are able to supply technology for ethanol production on a farm scale and larger.
Meer lezen
Miscanthus
Miscanthus is a large perennial grass used for energy production. Miscanthus is an environmentally friendly crop. Its large root system captures nutrients, and stems provide wildlife cover.
Meer lezen
Agricultural Waste to Biogas Plant to Keep Swiss Army Warm
Construction work has begun on a biogas plant in Bure, Switzerland that will provide heat for the local training barracks of the Swiss Army.
Meer lezen
Wiltshire’s first biogas plant opens for business
The doors have opened on a new biodigester in Wiltshire, UK following 12 months of construction and trails.
Meer lezen